Step-by-Step Guide

Roof Replacement Process Explained

Everything you need to know about what happens when you replace your roof. From initial inspection to final cleanup in 6 simple steps.

Quick Timeline Overview

1-2

Hours for inspection

3-10

Days for permits

1-2

Days for installation

2-3

Weeks total process

The 6-Step Roof Replacement Process

Here's exactly what happens from your first call to your completed new roof

STEP 11-2 hours

Initial Inspection & Assessment

A certified roofing inspector thoroughly examines your roof to assess its condition and determine if replacement is necessary.

What's Included:

  • Complete exterior roof inspection from ground and ladder
  • Interior attic inspection for ventilation and damage signs
  • Documentation of all damage with photos
  • Assessment of roof structure and decking condition
  • Measurement of roof area (squares calculation)
  • Identification of any code compliance issues

What to Expect

The inspector will walk around your property and may need attic access. They'll explain findings immediately and answer questions.

Pro Tip

Ask for a copy of all inspection photos and documentation for your records and potential insurance claims.

STEP 21-3 days

Detailed Estimate & Material Selection

You'll receive a comprehensive, itemized estimate and work with our team to select the best roofing materials for your home.

What's Included:

  • Itemized cost breakdown (labor, materials, disposal)
  • Material options with pros and cons for your situation
  • Color samples and style recommendations
  • Warranty information review
  • Financing options presentation
  • Timeline and scheduling discussion

What to Expect

We'll present options in person or via video call. Take time to review and ask questions - there's no pressure to decide immediately.

Pro Tip

For coastal SC homes, ask about hurricane-rated materials and impact-resistant shingles that may qualify for insurance discounts.

STEP 33-10 days

Permits & Preparation

We handle all permit requirements and prepare for your installation day, including material ordering and scheduling.

What's Included:

  • Building permit application and approval
  • Material ordering and delivery scheduling
  • HOA approval coordination (if applicable)
  • Utility company notification (if needed)
  • Dumpster delivery for old roofing materials
  • Scheduling of installation crew

What to Expect

Weather Shield handles all permit paperwork. You'll be notified when materials arrive and confirm your installation date.

Pro Tip

Permit timelines vary by municipality. Horry County typically processes within 5-7 business days.

STEP 4Day 1 (morning)

Property Protection & Tear-Off

Installation day begins with protecting your property and removing the existing roofing materials down to the decking.

What's Included:

  • Tarps placed over landscaping, AC units, and walkways
  • Plywood boards protect windows and siding
  • Removal of existing shingles, underlayment, and flashing
  • Inspection of roof decking for damage
  • Replacement of any rotted or damaged decking
  • All debris loaded into dumpster continuously

What to Expect

Work starts early (typically 7-8 AM). The tear-off is the noisiest part. You can stay home but expect some disruption.

Pro Tip

Move vehicles away from the house. Remove fragile items from walls inside. Inform neighbors about the project.

STEP 5Day 1-2

New Roof Installation

Your new roof is installed layer by layer following manufacturer specifications and local building codes.

What's Included:

  • Ice and water shield applied at eaves and valleys
  • Synthetic underlayment installed across entire roof
  • Drip edge and flashing installation
  • Starter shingles along edges
  • Field shingles installed with proper nail pattern
  • Ridge cap and ventilation components installed

What to Expect

A crew of 3-5 installers will work steadily throughout the day. Most residential roofs complete in 1-2 days.

Pro Tip

GAF-certified installation requires specific techniques. Ask about our Weather Shield Roofing GAF Master Elite certification.

STEP 62-4 hours

Final Inspection & Cleanup

A thorough quality inspection, complete cleanup, and final walkthrough ensure your 100% satisfaction.

What's Included:

  • Quality inspection of all installed components
  • Magnetic sweep for nails in yard and driveway
  • Debris removal and dumpster pickup
  • Gutter cleaning and downspout check
  • Final walkthrough with homeowner
  • Warranty registration and documentation

What to Expect

We'll walk you through the completed work, answer any questions, and provide all warranty documentation.

Pro Tip

Keep your warranty paperwork in a safe place. Register online with GAF for additional warranty benefits.

How to Prepare for Your Roof Replacement

Complete this checklist before installation day for a smooth process

Important: Our crew will handle all roof-related preparation. This checklist helps protect your property and makes the process smoother for everyone.

Common Questions About the Process

What homeowners ask most about roof replacement

Can I stay home during roof replacement?

Yes, you can stay home during the process. However, be prepared for significant noise, especially during tear-off. Some homeowners prefer to leave during the loudest portions (usually morning of day one). Your electricity and water will remain on throughout.

What if it rains during my roof replacement?

Weather Shield Roofing monitors forecasts closely and won't start work if rain is expected. If unexpected weather occurs, we immediately tarp all exposed areas. Your home remains protected throughout the process. We'll resume work as soon as conditions allow.

Do I need to be home during installation?

You don't need to be present during installation, but we recommend being available for the final walkthrough. We'll need access to your yard and may need to discuss any unexpected findings (like hidden damage).

How messy is roof replacement?

While the process generates significant debris, our crews contain it continuously. We use tarps, catch systems, and perform thorough magnetic sweeps for nails. Your property will be cleaner than you expect when we finish.

What happens if my decking is damaged?

Damaged decking is common, especially in coastal areas. We'll identify any issues during tear-off and discuss repairs with you immediately. Minor repairs are usually included; extensive damage may require additional cost (we'll get approval before proceeding).

How do I know the installation was done correctly?

Weather Shield Roofing is GAF Master Elite certified, meaning our work meets the highest industry standards. We conduct internal quality inspections, provide detailed photos, and offer our exclusive lifetime workmanship warranty. You can also request a third-party inspection.

Why Choose Weather Shield Roofing?

5.0★ Rating

73 Google reviews - highest rated in Myrtle Beach

GAF Certified

Master Elite contractor - top 2% nationwide

15+ Years

Serving the Grand Strand since 2010

Free Estimates

No obligation, transparent pricing

Ready to Start Your Roof Replacement?

Schedule your free inspection today. We'll walk you through every step of the process and provide a detailed, no-obligation estimate.